FHA 221(d)(4) or a bank construction loan for new apartments
HUD's 221(d)(4) lends 87% of cost at 1.15x DSCR on market-rate apartments and fixes the rate for construction plus up to 40 years, non-recourse. A bank construction loan lends less, floats, needs guarantees and must be refinanced at completion, but closes in a fraction of the time. Build to hold with patience: HUD. Build fast or to sell: the bank.
| FHA 221(d)(4) construction loans | Commercial construction loan | |
|---|---|---|
| Indicative rate today | Not published | Not published |
| Maximum LTV | 87% of cost1 | Not published |
| Eligible property | Large multifamily, Affordable housing | Large multifamily, Small apartment buildings, Flex and small-bay industrial, Industrial and warehouse, Self storage, Retail strip centers, Single-tenant net lease, Mixed use, Medical office, Office, Hotels, Seniors housing, Student housing |
| Minimum DSCR | 1.15x DSCR1 | Not published |
| Minimum debt yield | Not published | Not published |
| Loan size | Not published | Not published |
| Term | Up to 40 years (or 75% of remaining economic life, if less)2 | Not published |
| Amortization | Up to 40 years (or 75% of remaining economic life, if less)2 | Not published |
| Rate type | Fixed | Floating |
| Recourse | Non-recourse (standard carve-outs) | Full recourse |
| Prepayment | Lockout, Negotiated | Open (no penalty), Exit fee, Negotiated |
| Time to close | Not published | Not published |
| What happens at completion | Nothing; the same loan converts to its permanent amortization | A takeout: refinance into a permanent loan or sell |
| Rate | Fixed at closing for construction and the full amortization | Floating over SOFR or prime during construction |
| Guarantees | Non-recourse, with carve-outs for bad acts | Completion, carry and often repayment guarantees |
| Prevailing wages | Prevailing wages (Davis-Bacon) required on 221(d)(4) new construction and substantial rehab | Not required on private bank loans |
| Mortgage insurance | 0.65% (65 bps) prior; now 0.25% | None |
| Regulatory limit on the lender | HUD statutory per-unit limits, e.g. $103,004 per unit before high cost adjustment | Supervisory ceiling: 80% maximum LTV for commercial, multifamily and other nonresidential construction |
| Equity rule that shapes the loan | Cost-based sizing; equity is whatever the cost limit leaves | 15% of appraised as-completed value contributed keeps the loan out of HVCRE |
The verdict
Pick FHA 221(d)(4) construction loans if
You are building or substantially rehabbing apartments to hold for the long term, want the most leverage and no permanent-loan refinance risk, and can carry a long pre-construction process and prevailing wages.
Pick Commercial construction loan if
You need to start soon, the project is not apartments or is a mix HUD will not take, you plan to sell at stabilization, or your contractor and budget cannot absorb Davis-Bacon wage rates.
The real difference: one loan or two
A bank construction loan is the first of two loans. It funds the build, then has to be repaid by a permanent loan or a sale, at whatever rates and underwriting exist when the building is finished and leased. HUD’s 221(d)(4) is one loan: the rate is set at the initial closing, the loan funds construction in draws, and it then amortizes on HUD’s schedule: Up to 40 years (or 75% of remaining economic life, if less)2. You trade a long front end for the removal of takeout risk.
150 new apartments: HUD or bank plus takeout
Illustration. A developer will build 150 market-rate units for a total cost of $36,000,000, land included. Stabilized NOI is projected at $2,600,000; at an illustrative 6.0% cap rate the finished property is worth about $43,333,000. Assume HUD prices the note at 6.10% on a 40-year schedule, with the premium added for sizing. Assume the bank lends 65% of cost, floating, interest-only during construction, with a full completion and repayment guarantee.
| At closing (illustration) | FHA 221(d)(4) | Bank construction loan |
|---|---|---|
| Cost-based limit | 87% of cost = $31,320,000 | 65% of cost = $23,400,000 |
| Coverage limit on stabilized NOI | 1.15x: about $32,594,000 | tested by the takeout lender later |
| Loan | $31,320,000 | $23,400,000 |
| Developer equity | $4,680,000 | $12,600,000 |
| Coverage once stabilized | about 1.20x on principal, interest and premium | n/a until the takeout |
| Rate risk until stabilization | none | full; the takeout prices later |
HUD needs about $7,920,000 less equity. The bank developer gets some of that back later. If the permanent lender at stabilization quotes an illustrative 6.00% on a 30-year schedule at 1.25x, the takeout sizes to about $28,911,000, and about $5,511,000 comes back out before closing costs. At 6.75% the same test sizes to about $26,724,000, and the cash back shrinks by about $2,187,000. That swing is the takeout risk HUD removes.
Bank capital rules shape the bank’s offer. A construction loan that lacks enough contributed equity is classified as high-volatility commercial real estate. The threshold is 15% of appraised as-completed value (about $6,500,000 here), and HVCRE loans carry a capital risk weight of 150%4. The bank developer’s $12,600,000 clears it; a thinner equity check would make the loan more expensive or unavailable.
What each lender checks
HUD and its lender: the market study, the plans and specifications, an independent cost review, the general contractor’s qualifications and bonding, the wage determination, environmental review, and the sponsor’s experience and liquidity. Per-unit statutory limits cap the loan, and high-cost areas get more room: Up to 270% of base limits; up to 315% case by case in High Cost Areas5.
The bank: the sponsor’s track record and liquidity, the guarantor’s net worth, the general contractor contract and budget, the as-completed appraisal, presales or pre-leasing if any, and its own concentration room. The supervisory screen for construction: Construction, land development and other land loans at 100% or more of total risk-based capital6.
The costs people miss
- Davis-Bacon wages on HUD. Prevailing wages (Davis-Bacon) required on 221(d)(4) new construction and substantial rehab2. Prevailing wage rates can raise hard costs, and the payroll reporting adds administration for the contractor.
- HUD’s front end. Architecture, cost review and third-party reports must be done before closing, which means paying for them with equity while the land carries.
- Bank interest during construction. The floating rate on the drawn balance is paid from an interest reserve in the budget. A rise in SOFR during construction comes out of that reserve.
- Bank extension fees. If lease-up runs long, extensions cost fees and require tests.
- Two sets of closing costs on the bank path, construction and permanent.
- The guarantee. A bank’s completion and repayment guarantees sit on the sponsor’s balance sheet until the takeout.
Market conditions
Bank construction lending is the tightest corner of commercial real estate. The Federal Reserve’s July 2026 survey: Construction and land standards basically unchanged (net 3.7% eased)7, and Net 11.1% of banks saw weaker construction loan demand7. A significant net share of banks said construction lending standards sit at the tighter end of their range; standards for other CRE loans were relatively tight, but less so than in July 20258. FDIC data at mid-2026: $453 billion in bank construction and development loans9. HUD’s 2025 premium cut lowered the carrying cost of a 221(d)(4) against bank-plus-takeout execution.
Planning a ground-up apartment project? Send the budget, pro forma and schedule, and we will price HUD against bank construction with a modeled takeout.
Questions people ask
How long does a 221(d)(4) take to close?
Much longer than a bank loan. The lender prepares a full underwriting package, HUD reviews it (often in stages), and the plans, specifications, cost review and wage determination all have to be complete before closing. Plan the start of construction around HUD's timeline, not the other way round.
Can 221(d)(4) finance build-to-rent homes?
Since October 2026, in limited cases. HUD Mortgagee Letter 2026-12 (October 14, 2026) opened 221(d)(4) new construction and, for properties under 3 years past certificate of occupancy, 223(f) to build-to-rent communities10. Check the current Mortgagee Letter for the unit and site rules before designing a project around it.
Is there a better 221(d)(4) option for middle-income projects?
Yes. HUD's current middle-income rule offers 90% LTC and 1.11x DSCR when at least 50% of units target incomes up to 120% AMI11, with a use restriction of 10 years (Regional Center may waive down to no less than 5). The project must qualify through an eligible state or local program.
Related
Sources
- HUD Mortgagee Letter 2025-03, Multifamily Changes in DSCR and LTV/LTC, as of January 8, 2025
- HUD MAP Guide 4430.G (2020 MAP Guide, revision March 2021), as of March 19, 2021
- 12 CFR 324.2, definition of HVCRE exposure (eCFR), as of October 29, 2026
- 12 CFR 324.32(j) (eCFR), as of October 29, 2026
- HUD Mortgagee Letter 2026-05, Annual Revisions to Base City High Cost Percentage and MAP Guide thresholds, as of May 20, 2026
- Federal Register 71 FR 74580 (Dec. 12, 2006), OCC/Federal Reserve/FDIC final Guidance on Concentrations in CRE Lending, as of December 12, 2006
- Federal Reserve, July 2026 SLOOS, Table 1 (domestic banks), as of August 3, 2026
- Federal Reserve, Senior Loan Officer Opinion Survey, July 2026, as of August 3, 2026
- FDIC Quarterly Banking Profile Q2 2026, time series spreadsheets, as of June 30, 2026
- HUD Mortgagee Letter 2026-12, Build-To-Rent Developments Underwriting Eligibility, as of October 14, 2026
- HUD Mortgagee Letter 2026-01, Creating a Middle Income Housing option for 221(d)(4), as of January 22, 2026
- HUD Federal Register notice FR-6522-N-02 (90 FR 45789), Changes in Mortgage Insurance Premiums Applicable to FHA Multifamily Insurance Programs, as of September 23, 2025
- Northmarq, Rates & Spreads (Multifamily Conventional), as of October 22, 2026
- HUD Federal Register notice (91 FR 24597), Annual Indexing of Basic Statutory Mortgage Limits for Multifamily Housing Programs, CY2026, as of May 6, 2026
- eCFR, 12 CFR Part 365 Appendix A (Interagency Guidelines for Real Estate Lending Policies), as of November 26, 2021
How we check figures: methodology and editorial policy.