C-PACE financing

C-PACE pays for qualifying energy, water and resiliency improvements and is repaid on the property tax bill over a term of up to 30 years1, per PACENation. It can cover 100% of eligible hard and soft costs1 of the improvements, and programs were active in 36 states plus D.C.2. The deciding question is whether your mortgage lender will consent.

Updated . Index rates refresh every business day.

Key terms

Who it lends to
Lender typeC-PACE capital provider
Eligible propertyOffice, Retail strip centers, Single-tenant net lease, Flex and small-bay industrial, Industrial and warehouse, Hotels, Large multifamily, Mixed use, Medical office, Seniors housing, Self storage, Special purpose
Loan purposesConstruction, Renovation, Rate-and-term refinance
Loan sizeNot published
Leverage and coverage
Maximum loan-to-valueNot published
Minimum DSCRNot published
Minimum debt yieldNot published
Structure and pricing
Termup to 30 years1. Set by each state statute and generally limited to the useful life of the improvements financed.
Amortizationup to 30 years1. Fully amortizing through level assessment installments, so there is no balloon.
Interest-onlySome programs allow capitalized interest during construction before installments begin.
Rate typeFixed
Index and spread10-year Treasury. C-PACE capital providers quote a fixed rate for the full term; no public source reports a market spread. Compare it with the blended cost of the senior loan and any mezzanine or preferred equity it replaces.
Risk, cost and speed
RecourseNon-recourse (standard carve-outs). Non-recourse to the owner personally. The assessment is collected like a property tax and is secured by a lien on the property that in most states ranks ahead of the mortgage for unpaid installments.
PrepaymentNegotiated. Set by the program and the capital provider; many charge a prepayment premium or require yield protection in the early years.
Time to closeThe program’s eligibility review, the engineering report on the improvements and the mortgage lender’s consent set the pace; the consent is usually the long pole.
Program administration feeCharged by the local program or its administrator.
Engineering and energy reportDocuments that the improvements qualify and, in many programs, that projected savings meet the program test.
Reference figures (context, not program limits)
Share of eligible project hard and soft costs PACE can fund (PACENation)100% of eligible hard and soft costs1
States with PACE-enabling legislation (PACENation)40 states plus D.C.2
States with active PACE programs (PACENation)36 states plus D.C.2
Cumulative C-PACE investment through December 2025 (PACENation)$13.5 billion3

Indicative rate today

Priced deal by deal. This site has no verified public spread for this program, so it shows none.

As of : 10-year Treasury 4.94%

Indicative only, not a quote. How this is built

Size it

Test the loan amount against LTV, DSCR and debt yield with your own numbers.

Open the loan sizer

How C-PACE works

A state passes enabling legislation; a county or city opts in and sets up a program; a private capital provider funds the project; the local government levies a special assessment on the property; the owner repays it in installments with property taxes. When the property sells, the remaining assessment usually stays with the property.

PACENation reports $13.5 billion3 of cumulative C-PACE investment across 3,837 projects3 through December 2025, with 55%3 of the investment in energy efficiency. Legislation exists in 40 states plus D.C.2, but a program has to be active in your county before you can use it.

What it can pay for

Typically eligible Typically not eligible
HVAC, chillers, boilers, controls Ordinary repairs with no efficiency gain
Building envelope: roof, windows, insulation Furniture, fixtures and tenant equipment
Lighting and electrical upgrades Land and acquisition cost
Solar, storage and other renewable systems Work outside the program’s eligible list
Water efficiency
Resiliency measures such as wind, flood or seismic hardening, where the state allows

Eligibility is set by each state statute and program. An engineering or energy report usually documents what qualifies.

Worked example: C-PACE in a construction capital stack

Illustration only. Costs, rates and terms are assumptions.

A developer builds a $50,000,000 hotel. The construction lender will fund 60% of cost, or $30,000,000. Of the $20,000,000 gap, $7,000,000 is qualifying building systems.

Layer Without C-PACE With C-PACE
Senior construction loan $30,000,000 $30,000,000
C-PACE none $7,000,000
Mezzanine or preferred equity $7,000,000 none
Sponsor equity $13,000,000 $13,000,000

At an assumed 7.00% fixed over 25 years with annual installments, the $7,000,000 assessment costs about $600,700 a year, a fixed, fully amortizing cost with no balloon. Replacing a higher-cost subordinate layer with that is the usual C-PACE case. The catch is that the installment ranks with property taxes, so the senior lender must agree and will count the installment when it sizes its own loan. Model the blend in the blended rate calculator and the payment schedule in the amortization schedule calculator.

Terms to compare

Term What to ask
Rate Fixed for the full term? Any capitalized interest during construction?
Term The maximum allowed by the program and the useful life of the improvements
Size cap Each state caps the assessment against property value; the cap differs by state
Prepayment Premium or yield protection in early years, set by the capital provider
Pass-through Whether your leases let you pass the installment through to tenants as a tax
Consent The senior lender’s consent form, and whether it asks for any change to the loan

What capital providers and programs check

  1. Eligibility of the improvements against the program’s list, documented by an engineer.
  2. Property value against the state’s cap on the assessment.
  3. Mortgage lender consent for every existing mortgage.
  4. Property tax payment history and no outstanding tax liens.
  5. The owner’s ability to carry the installment along with the mortgage.

Common deal killers

  • No lender consent. Some senior lenders, including some securitized loans, will not accept a senior-ranking assessment.
  • No active program in the county, even where the state allows one.
  • Ineligible work. Cosmetic upgrades and tenant fit-out usually do not qualify.
  • Assessment above the state cap relative to property value.

Where it wins and where it loses

C-PACE wins on new construction and major renovation where qualifying systems are a large share of cost, and for owners who want long fixed-rate money with no balloon. It replaces some of the mezzanine or preferred equity that would otherwise fill the gap above a construction loan. It loses when the senior lender will not consent, when the owner plans to sell soon to a buyer who will not accept the assessment, and on small projects where program and engineering costs eat the benefit.

Questions people ask

Does C-PACE count as debt?

It is a special assessment, not a mortgage, and it is collected with property taxes. Lenders and appraisers still treat the annual installment as a cost of owning the property, so it reduces the cash flow available for the mortgage. Most senior lenders count it when they size their loan.

Why does my mortgage lender have to consent?

Because in most programs an unpaid assessment installment has the same lien priority as property taxes, which ranks ahead of the mortgage. Most programs require the existing mortgage lender's written consent before the assessment is recorded.

Can C-PACE fund new construction?

In many states, yes. PACENation notes it is available for new construction and gut rehab in many programs1. On a new building it finances the qualifying systems (envelope, HVAC, lighting, solar, water and resiliency measures) and often replaces part of the mezzanine or preferred equity in the capital stack.

Sources

  1. PACENation, What is PACE Financing?, as of November 1, 2026
  2. PACENation, PACE Programs, as of November 1, 2026
  3. PACENation, PACE Market Data, as of November 1, 2026

How we check figures: methodology and editorial policy.

Get financing for this deal

Send the property and the loan once. A person at Janover Capital LLC reads it, tells you which programs fit and replies, usually within one business day.

Get financing