Commercial construction loans

Bank construction loans on commercial and multifamily projects sit under a federal ceiling of 80% maximum LTV for commercial, multifamily and other nonresidential construction1, and a loan stays out of the costlier HVCRE capital class only when the borrower contributes 15% of appraised as-completed value2. Pricing floats over SOFR, shown live below; no public source publishes construction spreads.

Updated . Index rates refresh every business day.

Key terms

Who it lends to
Lender typeBank
Eligible propertyLarge multifamily, Small apartment buildings, Flex and small-bay industrial, Industrial and warehouse, Self storage, Retail strip centers, Single-tenant net lease, Mixed use, Medical office, Office, Hotels, Seniors housing, Student housing
Loan purposesConstruction, Renovation
Loan sizeNot published
Leverage and coverage
Maximum loan-to-valueNot published
Minimum DSCRNot published
Minimum debt yieldNot published
Structure and pricing
TermBuilt around the construction schedule plus lease-up, with extension options that require tests to be met. Some banks offer a mini-perm that converts to an amortizing loan after stabilization.
AmortizationInterest only during construction; amortization starts only if the loan converts to a mini-perm.
Interest-onlyInterest only on the drawn balance, usually paid from an interest reserve built into the budget.
Rate typeFloating
Index and spread30-day average SOFR. No public source publishes construction loan spreads. Banks quote over SOFR or prime, often with a floor, and price for the sponsor’s track record and the deposits it brings.
Risk, cost and speed
RecourseFull recourse. Expect a completion guarantee, a carry or interest guarantee and often a full or partial repayment guarantee that steps down as the project stabilizes.
PrepaymentOpen (no penalty), Exit fee, Negotiated. Usually prepayable without yield maintenance, because the lender expects to be taken out. Some lenders charge an exit fee unless they also provide the permanent loan.
Time to closeLonger than a permanent loan: the lender reviews plans, the budget, the contract and the contractor, and orders an as-completed appraisal before it commits.
Origination feeCharged on the full commitment, not the drawn balance.
Construction monitoringThe lender’s inspector reviews every draw; the borrower pays for each inspection.
Extension feeCharged when an extension option is exercised.
Reference figures (context, not program limits)
Federal supervisory LTV ceiling, commercial and multifamily construction80% maximum LTV for commercial, multifamily and other nonresidential construction1
Contributed capital that keeps a loan out of HVCRE15% of appraised as-completed value2
Bank capital risk weight on an HVCRE loan150%7
Supervisory concentration screen, construction and landConstruction, land development and other land loans at 100% or more of total risk-based capital8
Bank construction and development loans outstanding (FDIC)$453 billion in bank construction and development loans3
Where bank construction standards sit (Fed SLOOS)at the tighter end of banks' historical range5

Indicative rate today

Priced deal by deal. This site has no verified public spread for this program, so it shows none.

As of : 30-day average SOFR 3.90%

Indicative only, not a quote. How this is built

Size it

Test the loan amount against LTV, DSCR and debt yield with your own numbers.

Open the loan sizer

A construction loan funds a building that does not exist yet, so the lender is underwriting three things at once: the budget, the builder and the exit. It is the hardest commercial loan to get and the one with the most moving parts after closing. Banks are still the main source: $453 billion in bank construction and development loans3 at mid-2026, and NCUA data show $11 billion in credit union commercial construction and development loans4.

Conditions are not loose. In the Federal Reserve’s July 2026 survey, bank standards for construction and land loans were basically unchanged (Q2 2026)5, demand was weaker (Q2 2026)5, and standards remained at the tighter end of banks' historical range5.

The rules behind every bank construction loan

Three regulatory facts shape every term sheet, whether or not the banker mentions them:

  1. The supervisory ceiling. Bank policy cannot exceed 80% maximum LTV for commercial, multifamily and other nonresidential construction1. That is measured against value, and LTC = the loan amount divided by total cost (property plus all construction costs)6.
  2. HVCRE. A commercial construction loan is a high volatility exposure, carrying a 150%7 capital risk weight, unless it meets an exemption. The main one requires an LTV inside the supervisory limit and 15% of appraised as-completed value2 contributed by the borrower, kept in the project until permanent financing or sale. Banks price HVCRE loans higher or avoid them, so plan your equity to clear the test.
  3. Concentration. Examiners flag banks whose construction and land book reaches 100% of total capital8. A bank near that line may pass on a good deal for reasons that are not about you.

Sizing a construction loan (worked example)

Illustration: a 60-unit apartment building. Land bought for $2,000,000 in cash, hard costs of $11,000,000 on a guaranteed maximum price contract, and soft costs of $2,000,000 including fees and the interest reserve. Total cost $15,000,000. The appraiser’s as-completed value is $19,000,000 and projected stabilized NOI is $1,235,000. Suppose the bank offers 60% of cost.

Test Math Result
Loan-to-cost $15,000,000 × 60% $9,000,000 loan
Loan-to-value, as completed $9,000,000 ÷ $19,000,000 47%, inside the supervisory ceiling
Equity required $15,000,000 − $9,000,000 $6,000,000, including the land
HVCRE contributed capital test 15% × $19,000,000 = $2,850,000 $6,000,000 contributed clears it
Debt yield at stabilization $1,235,000 ÷ $9,000,000 13.7%
Takeout check A permanent loan at 1.25x, 6.25% and 30 years supports about $13.4 million Comfortably repays $9.0 million

The takeout check is the step borrowers skip. A construction lender wants to see that a permanent lender will repay it at stabilization under conservative rates. Run your project through the LTV and LTC calculator and the debt yield calculator.

The interest reserve. You pay interest only on drawn money, and the balance grows as work is done. A rough rule for budgeting: the average balance over the build is a bit more than half the loan. On $9,000,000 at an illustrative 8.50% over 18 months with an average draw of 55%, interest is about $631,000. That reserve is part of the budget, and part of what the loan funds.

How draws work

  1. The borrower’s equity goes in first, before the bank funds a dollar.
  2. Each month the contractor submits a pay application. The lender’s inspector confirms the work in place.
  3. The bank funds the verified amount less retainage (a holdback paid at completion), after a title date-down confirms no new liens.
  4. Change orders over a set threshold need the lender’s consent. If the budget runs over, the borrower funds the gap before the next draw. That is what the completion guarantee enforces.

Guarantees

Guarantee What it covers How to negotiate it
Completion Finishing the building lien-free, on the plans the lender accepted Tie it to the agreed budget plus a contingency
Carry or interest Interest, taxes and insurance until stabilization Ask for it to end at a coverage test
Repayment Some or all of the loan balance Ask for a step-down at completion and again at stabilization
Environmental and carve-outs Standard bad acts Usually not negotiable

Costs and timeline

The lender reviews plans, the budget, the construction contract, the contractor’s financials and the permit status, and orders an as-completed appraisal and a plan and cost review. Expect the commitment to take noticeably longer than a permanent loan. Fees are charged on the full commitment, and each draw inspection and any extension carry their own fee.

Common deal killers

  • Equity that is mostly land appreciation or deferred developer fees. Banks and HVCRE rules may not count it as you do.
  • No guaranteed maximum price contract, or a contractor without the balance sheet to stand behind it.
  • Permits not in hand. Most banks will not close before building permits issue.
  • A takeout that only works at today’s rents and a low rate. The bank will stress both.
  • Thin sponsor liquidity against the size of the completion guarantee.

Alternatives when a bank says no

Questions people ask

What loan-to-cost do banks lend on commercial construction?

Each bank sets its own, and no public source publishes a market figure. What is published are the rules around it: a loan-to-value ceiling of 80% maximum LTV for commercial, multifamily and other nonresidential construction1 measured on value, and the HVCRE test that requires the borrower to contribute 15% of appraised as-completed value2 for the loan to avoid a higher capital charge. Banks normally size well inside both.

Can I count my land as equity on a construction loan?

Usually, but at the value the rules allow. For HVCRE purposes, contributed real property counts at its appraised value, and the capital must stay in the project until it is permanently financed or sold. Lenders may still give less credit for land bought recently at a low price, or for land with a loan on it.

Do construction loans require a personal guarantee?

Nearly always on bank loans. Expect a completion guarantee, a guarantee to cover interest and operating shortfalls, and often a repayment guarantee that steps down as the project leases up. HUD 221(d)(4) is the main non-recourse alternative for apartments.

Sources

  1. eCFR, 12 CFR Part 365 Appendix A (Interagency Guidelines for Real Estate Lending Policies), as of November 26, 2021
  2. 12 CFR 324.2, definition of HVCRE exposure (eCFR), as of October 29, 2026
  3. FDIC Quarterly Banking Profile Q2 2026, time series spreadsheets, as of June 30, 2026
  4. NCUA 5300 Call Report quarterly data, June 30, 2026 (bulk file FS220L), as of June 30, 2026
  5. Federal Reserve Board, July 2026 Senior Loan Officer Opinion Survey on Bank Lending Practices (released August 3, 2026), as of August 3, 2026
  6. OCC Comptroller's Handbook, Commercial Real Estate Lending (Version 2.0), as of March 2022
  7. 12 CFR 324.32(j) (eCFR), as of October 29, 2026
  8. Interagency Guidance, Concentrations in Commercial Real Estate Lending, Sound Risk Management Practices, 71 FR 74580 (Federal Register, Dec. 12, 2006), as of December 12, 2006