Loans for condominium projects
A condo project is paid off by unit sales, so lenders size to net sellout, presales and absorption instead of rent. Federal guidelines class condominium construction under multifamily: 80% maximum LTV for commercial, multifamily and other nonresidential construction1. Your buyers decide the rest. Under its Full Review, Fannie Mae requires at least 50% of the units in the project or legal phase2 to be sold or under contract in a new project.
| Federal supervisory LTV ceiling for construction, which includes condominiums | 80% maximum LTV for commercial, multifamily and other nonresidential construction1 |
|---|---|
| Equity that keeps a bank construction loan out of HVCRE treatment | 15% of appraised as-completed value4 |
| Bank construction and land standards, net (Fed SLOOS) | Construction and land standards basically unchanged (net 3.7% eased)8 |
Programs that lend on it
Not ranked by price: none of these programs has a published spread that applies here.
| Program | Indicative rate | Leverage benchmark | Rate type | Recourse |
|---|---|---|---|---|
| Bank commercial mortgage | Deal by deal | 80%1 (bank supervisory construction ceiling) | Fixed, Floating, Fixed then adjustable | Full recourse |
| Commercial construction loan | Deal by deal | Set deal by deal | Floating | Full recourse |
| Commercial bridge loans | Deal by deal, this index does not cover this asset | Set deal by deal | Floating | Deal by deal |
| Debt fund and mortgage REIT loans | Deal by deal, this index does not cover this asset | Set deal by deal | Floating | Deal by deal |
| Hard money and private commercial loans | Deal by deal | Set deal by deal | Fixed, Floating | Full recourse |
Layers that can sit on or around the senior loan here: Mezzanine and Pref equity.
Programs that are out or unconfirmed
| Fannie Mae and Freddie Mac | We could not confirm a current published policy for this type, so neither is listed. Ask the lender before counting on one. |
|---|---|
| SBA 7(a) and 504 | The operating business must occupy at least 51% of rentable space in an existing building, so a building held as a rental investment does not qualify. |
The loan is repaid by closings, so the buyer’s mortgage rules are the real covenant
An apartment loan is repaid by rent or a refinance. A condo loan is repaid by individual buyers, each bringing their own financing, and each subject to rules about the project that the developer has to meet. A project that misses those rules has units nobody can finance, which is a failed exit for the lender.
| Who you need to satisfy | What they test | When it hits |
|---|---|---|
| Your construction lender | Net sellout, presales, cost, sponsor record | Before the first draw |
| Your equity or mezzanine provider | Profit margin and timing of the return | Before closing |
| The buyer’s lender, applying Fannie Mae, Freddie Mac or FHA project standards | Presales, completion, reserves, commercial space, single-entity ownership | At every unit closing |
| Your state regulator | Offering documents, deposits, buyer rescission rights | Before the first contract |
| Federal land sales law | Condo units are exempt from registration, not from everything | At marketing |
The numbers that replace DSCR
Net sellout. Gross sales of all units, less broker fees, closing costs and transfer taxes. This is the lender’s collateral value in practice, and the appraisal is often compared against it.
Loan to net sellout. Loan divided by net sellout. A lower ratio means sale prices can decline further before the loan is impaired.
Absorption. Units closed per month. Lenders look to competing projects, the marketing record and the price band, not to the developer’s sales forecast. The months it takes to sell out decide the interest bill and the extension risk.
Presales, and how much cash stands behind them. A contract with a small refundable deposit counts for less than one with a large non-refundable deposit. Lenders review the contract form, the deposit amount, whether the buyer has mortgage approval, and whether buyers are bulk or related parties.
Release price. The amount per unit the lender gets at each closing. Usually most or all of net proceeds, until the loan is paid off. The developer’s profit arrives last.
Cost per sellable square foot. Measured on sellable area, not gross, because corridors, lobbies and amenities cost money and are sold only inside the unit price.
Federal guidelines require banks to have standards on pre-sale and minimum unit release for non-income-producing property, on feasibility studies and sensitivity analysis, on interest reserves, and on hard equity. They do not set the number. No public source publishes market presale or release thresholds, so any figure you hear comes from that lender’s own policy.
What federal capital rules do to your stack
Condominium construction sits in the multifamily line of the supervisory table, with the 80% maximum LTV for commercial, multifamily and other nonresidential construction1. Banks can go above it only inside a limited exception basket, so a higher advance usually arrives as a second capital layer rather than a bigger senior loan.
A loan outside the high volatility exclusion carries a 150%3 risk weight. To stay out, the borrower contributes 15% of appraised as-completed value4 and keeps it in the project. Federal law counts contributed land at appraised value, which helps a sponsor who has held the site for a while.
| Layer | Provider | What it costs you |
|---|---|---|
| Senior construction | Bank, debt fund | Full completion guarantee; recourse is typical |
| Mezzanine | Mezzanine lender | Pledge of ownership; an intercreditor with the senior |
| Preferred equity | Preferred investor | Priority return; control rights if the plan slips |
| Sponsor and common equity | You, partners | Last dollar back, and the profit |
| Buyer deposits | Buyers, under state law | Whether they can pay for construction depends on the state and the contract. Do not count them as equity without counsel’s sign-off |
Agency project rules that shape your sales plan
Agency money does not fund the project, but it does fund a good share of the buyers. Fannie Mae’s current standards are the most detailed public reference, and a project designed to meet them can sell to more financed buyers.
| Fannie Mae test | Current standard | What it means for the developer |
|---|---|---|
| Presales in a new or newly converted project | at least 50% of the units in the project or legal phase2 | Counted on principal residence and second home buyers. Investor contracts do not help this number. |
| Completion | The project or legal phase must be substantially complete, unless Fannie Mae approves other arrangements | Plan phases on purpose. A single-building project cannot be phased under this review. |
| Commercial space | 35%5 | Ground-floor retail is fine only below this line, measured in the project or building |
| Single-entity ownership | 20% of the units in projects with 21 or more units5 | Bulk buyers and rented sponsor units count |
| Reserves in the association budget | at least 10% of the budget6 | Budget must show it from the start; a low assessment that wins early sales can fail this test |
| Assessment delinquency | No more than 15% of the units6 may be 60 days or more past due | The sponsor’s own unsold units need to be paying their assessments |
| Operating as a hotel | Ineligible, even with individually owned units; mandatory rental pools too | A condo-hotel loses this buyer financing altogether |
FHA runs a separate track. A unit qualifies only if the project is approved by HUD or a DELRAP mortgagee, is a site condominium, or passes single-unit approval, and federal rules let HUD set commercial space and owner-occupancy limits by notice. Check the current handbook before you underwrite to FHA buyers.
A buyer whose lender will not accept the project still has a route: portfolio loans on non-warrantable units. Expect bigger down payments and fewer lenders, and read that as a smaller buyer pool and slower absorption, not as a solved problem.
Worked example: an illustration, not a quote
A 40-unit project with an average price of $600,000. All figures are made up for arithmetic.
| Line | Base case | Prices down 10% |
|---|---|---|
| Gross sellout | $24,000,000 | $21,600,000 |
| Selling costs at 6% | ($1,440,000) | ($1,296,000) |
| Net sellout | $22,560,000 | $20,304,000 |
| Net per unit | $564,000 | $507,600 |
| Total project cost | $19,500,000 | $19,500,000 |
| Profit before tax | $3,060,000 | $804,000 |
| Senior loan at 65% of cost | $12,675,000 | $12,675,000 |
| Loan to net sellout | 56.2% | 62.4% |
| Units to retire the loan with all net proceeds | 23 | 25 |
The senior is covered in either case, while the sponsor’s return falls by nearly three quarters. That shows why a lender is comfortable where an equity investor is not.
Pace changes the picture as well. At 3 closings per month, 23 units take about 7.7 months. At 1.5 per month, about 15.3 months. With a balance that declines evenly and interest at 9.00%, average-balance interest is about $364,000 at the fast pace and about $729,000 at the slow one. Half the sales pace costs another $364,000, comes straight out of profit, and might outrun the loan’s maturity.
Now apply the agency presale. Twenty contracts from principal residence or second home buyers are needed in this 40-unit building before agency-financed buyers can close. A project that opened with investor contracts might have 30 units sold and still fail that test.
New construction or conversion
| Topic | Ground-up | Conversion of an apartment building |
|---|---|---|
| Key cost risk | Hard cost and time | Hidden conditions, tenant buyouts |
| Income during the work | None | Remaining rent can carry part of the interest |
| Fallback if sales stall | Rent the units, subject to single-entity and loan terms | Revert to rentals, often the stronger plan |
| Legal issue | Construction defect and warranty | Tenant protections, notices and rights of first refusal, which vary by state and city |
| Agency treatment | New project rules | Newly converted rules: treated like new |
Unsold inventory and how projects end
When units remain after completion, the construction loan generally needs to be replaced or extended. Three routes:
- Extension. Usually tied to a minimum sales count and a paydown. The cheapest route if the lender is cooperative.
- Inventory loan. A bridge or debt fund loan secured by the remaining units. Priced above construction debt, and sized to a discounted bulk value.
- Bulk sale. Sell the remainder to one buyer at a discount. A fast clean exit, but check whether the buyer’s concentration breaks the single-entity test for the owners who already closed and their future resale buyers.
Value here has no going-concern or furniture component unless the project includes a hotel operation, which is a different financing problem. What the next owner buys is a stream of unit sales less the discount for carrying them, which is why a bulk price comes in well below retail.
Regulation worth a call to counsel
Condo law is mostly state law. Offering plans, public report filings, deposit escrow, buyer rescission periods and statutory warranties all differ by state, and some states restrict use of deposits in construction. Confirm each before you model the deposit line.
Federally, a 2014 amendment to the Interstate Land Sales Full Disclosure Act removed condominium units from the registration requirement, and defines those units as residential or commercial property designated for separate ownership. The registration exemption is not an anti-fraud exemption, so the sales materials still matter.
Construction defect exposure outlives the loan. Lenders ask about general liability coverage for completed operations, wrap-up insurance programs and the tail period, and the association’s right to sue the sponsor. Environmental review follows any construction loan. A Phase I must be done within 1 year before acquisition, with interviews, lien and records searches and site visit updated within 180 days7.
Which programs fit, and which refuse
| Source | Fit | Note |
|---|---|---|
| Bank construction | First call for experienced sponsors | Completion guarantee, supervisory limits, presale policy |
| Debt fund | Larger projects, higher leverage, fewer presales | Floating rate, higher cost |
| Mezzanine and preferred equity | Fills the gap above the senior | Needs a net sellout cushion |
| Bridge | Inventory, unfinished project recapitalization, conversion | Short term, floating |
| Hard money | Small projects, last-resort inventory | High cost, short term |
| Permanent agency loans, FHA multifamily | Not for a for-sale project | Rental programs |
| SBA | Not for a developer | A developer building units to sell is not a business occupying its own premises |
| CMBS | Rare for for-sale projects | Needs income from rent |
What stops a condo deal
- The sale prices are above the closed comparables, and the support is a list of listings.
- Presale contracts were signed with small refundable deposits.
- Sales include a block to one investor or a related party.
- The HOA budget is deliberately thin to make the monthly payment look competitive.
- The commercial component is above the agency cap, and the plan does not say so.
- The construction contract is not guaranteed maximum price, or the contractor has no comparable completions.
- The sponsor’s completion guarantee is backed by a net worth that is mostly the project.
- The site has a single building but the sales plan assumes phased closings.
What to bring
- Condominium declaration, draft or filed, and public offering statement
- Project budget with sellable square foot and unit mix
- Pricing schedule by unit, and market study with closed comparable sales
- Presale log with deposit amounts and buyer financing status
- Contract form and escrow arrangements for deposits
- Guaranteed maximum price contract, plans, permits and contractor financials
- Pro forma HOA budget, with reserve line
- Sponsor track record of completed for-sale projects, with sellout dates
- Guarantor financials and contingent liabilities
- Insurance plan for completed operations
- Title, survey, Phase I and geotechnical reports
Send the unit mix, price schedule, presale log and capital stack, and we will show you where the senior and the gap pieces land. Get financing for a condominium project.
Similar property types
Questions people ask
How many presales does a condo construction lender want?
No public source publishes a standard. Federal guidelines require banks to set pre-sale and minimum unit release standards for this kind of loan, and each lender writes its own. The one published threshold that matters is the agency one on the end buyer: at least 50% of the units in the project or legal phase2, counted as units conveyed or under contract to principal residence or second home buyers.
Can Fannie Mae or Freddie Mac finance the building itself?
We could not confirm a current agency program that lends on a for-sale condo project during construction. Their rules apply to the mortgages buyers use to purchase the finished units, and those rules set the sales pace your project loan depends on.
Do the units I still own count against the single-entity limit?
Vacant units owned by the sponsor and actively marketed for sale are excluded from Fannie Mae's single-entity calculation. Units that are rented do count. So renting unsold units as a stopgap can push a project over 20% of the units in projects with 21 or more units5 and shut off agency financing for your remaining buyers.
What is a loan to net sellout?
The loan divided by total expected sale proceeds after broker commissions, closing costs and similar deductions. It is the condo equivalent of LTV, and it shows how far prices can fall before the loan is not covered.
Related
Sources
- eCFR, 12 CFR Part 365 Appendix A (Interagency Guidelines for Real Estate Lending Policies), as of November 26, 2021
- Fannie Mae Selling Guide, Full Review: Additional Eligibility Requirements for Units in New and Newly Converted Condo Projects (08/05/2026), as of August 5, 2026
- 12 CFR 324.32(j) (eCFR), as of October 29, 2026
- 12 CFR 324.2, definition of HVCRE exposure (eCFR), as of October 29, 2026
- Fannie Mae Selling Guide B4-2.1-03, Ineligible Projects (11/04/2026), as of November 4, 2026
- Fannie Mae Selling Guide B4-2.2-01, Full Review Process (08/05/2026), as of August 5, 2026
- 40 CFR 312.20, All Appropriate Inquiries timing, eCFR, as of October 29, 2026
- Federal Reserve, July 2026 SLOOS, Table 1 (domestic banks), as of August 3, 2026
- SBA SOP 50 10 8.1, Lender and Development Company Loan Programs (effective Oct 1, 2026), as of October 1, 2026
- 12 CFR Part 34, Subpart D, Appendix A: Interagency Guidelines for Real Estate Lending, as of November 2026
- 12 U.S.C. 1831bb: capital rules for HVCRE ADC loans, as of November 2026
- Public Law 113-167: condominium amendment to the Interstate Land Sales Full Disclosure Act, as of September 2014
- 24 CFR 203.43b: FHA eligibility of condominium units, as of November 2026
How we check figures: methodology and editorial policy.