Loans for commercial land

Commercial land borrows at the lowest leverage in real estate because it pays nothing while the loan is open. Federal guidelines cap bank loans at 65%1 of value for raw land and 75%1 for land development, and those are ceilings, not offers. Banks lend first, on the guarantor's cash flow and a credible exit. Private lenders price the rest.

Updated . Rates refresh every business day.

Federal supervisory LTV ceiling, raw land65% maximum LTV for raw land1
Federal supervisory LTV ceiling, land development75% maximum LTV for land development1
Supervisory concentration screen for bank construction and land booksConstruction, land development and other land loans at 100% or more of total risk-based capital2
Bank demand for construction and land loans (Fed SLOOS)weaker (Q2 2026)3

Programs that lend on it

Not ranked by price: none of these programs has a published spread that applies here.

ProgramIndicative rate Leverage benchmark Rate type Recourse
Commercial land loan Deal by deal Set deal by deal Floating, Fixed Full recourse
Hard money and private commercial loans Deal by deal Set deal by deal Fixed, Floating Full recourse
Debt fund and mortgage REIT loans Deal by deal, this index does not cover this asset Set deal by deal Floating Deal by deal
Indicative rates are today's index plus each program's published spread; not quotes. No listed program publishes a maximum LTV for this property type, so the leverage column shows a labeled benchmark where one exists.

Start with where the site sits on the entitlement ladder

A land loan is priced on how much has to go right before someone can build. The acreage matters less than the distance to a building permit.

Stage What exists Who usually lends What the lender is really underwriting
Raw, unzoned or wrong zoning Dirt and a survey Private lenders; a relationship bank if the guarantor is strong The guarantor. The site is a liquidation value.
Zoned, no site plan Use is permitted in principle Bank land loan, hard money Time and cost to approval
Entitled: site plan and approvals in hand A buildable project on paper Bank land loan, debt fund on larger sites Whether a construction lender will take out the loan
Pad-ready: utilities, grading and curb cuts done Finished lots or pads Bank, sometimes rolled into the construction loan Pad sale or ground lease pricing, and the buyer pool
Under contract to a tenant or user Signed lease or purchase contract Bank, including short-term acquisition debt The counterparty and the conditions in the contract

The rule of thumb that works: every rung up the ladder widens the lender pool and shortens the argument. Spending entitlement money with your own equity first, and borrowing only once the zoning risk is gone, usually costs less than borrowing against raw acreage and hoping.

What federal rules actually limit

Land is one of the few property types where a federal number sits directly on the deal. The interagency real estate lending guidelines set a supervisory limit of 65%1 on raw land and 75%1 on land development. A land development loan means credit to improve unimproved property before structures go up: sewers, water, utility lines, streets.

Three details decide how the ceilings bite:

  • They bind banks, not private lenders. Debt funds and hard money lenders set their own limits, which is why they exist in this niche. No public source publishes what they advance, so treat any figure you hear as a quote from that lender.
  • A multi-phase loan takes the limit of the final phase. Where one loan funds land development and then a building, the guidelines apply the limit for the last phase funded, and disbursements should not run ahead of actual outlays. That is why a land-plus-construction loan can show better leverage on paper than land alone, while the cash still arrives only as work is done.
  • Banks also watch their total book. The supervisory screen for construction and land concentration is 100% of total capital2. A community bank close to that line may turn down a good land loan for reasons that have nothing to do with your site. If one bank says it is full, ask the next.

Current appetite is on the record. The Federal Reserve’s July 2026 survey of senior loan officers found construction and land standards basically unchanged (Q2 2026)3, sitting at the tighter end of banks' historical range3, with demand weaker (Q2 2026)3.

The metric that replaces NOI: months of carry you can prove

There is no DSCR on a vacant parcel, so lenders use a different set of questions. In order of weight:

  1. Guarantor liquidity against total carry. Add interest, property tax, insurance, engineering and consultant bills for the full expected hold plus a cushion. If the liquid guarantor cannot cover that without selling the land, the file is weak however good the site is.
  2. Outside cash flow. Global cash flow of the guarantor stands in for the rent that does not exist. A bank will read tax returns before it reads the site plan.
  3. Exit specificity. “Sell it when the market improves” is not an exit. A named takeout route is: construction loan application, pad contract, ground lease letter of intent, a user’s site selection.
  4. Price per buildable unit. Value is compared per buildable square foot, per allowed FAR, per pad or per lot, and never per gross acre alone. Setbacks, parking ratios, detention ponds and road dedication can consume a surprising share of a parcel.
  5. Comparable land sales. Land appraisals rest on a thin set of trades. A buyer paying well above recent sales should expect the appraisal to come in at the comparables, and for the supervisory limit to apply to that lower figure.

Federal guidelines tell banks to set policy on hard equity, on interest reserves, on non-amortizing loans and on takeout commitments for this kind of credit. Interest-only is common. Some banks require principal curtailments on a schedule, so a loan that gets extended also shrinks.

How the next owner values it

Land has no going-concern value and no furniture to allocate. Its value is residual: what a developer can pay after building a finished product, paying costs and earning a profit. Two consequences follow.

A residual value is highly levered to its assumptions. A small rise in hard costs or a small fall in end-product rents can erase most of it, which is why land values fall faster than building values in a downturn, and why lenders treat the appraisal as the optimistic case.

A forced sale is a different market. Without an entitlement, a deadline and a buyer, a bank collects whatever a local land speculator will pay. That thought sits behind the personal guarantee, and behind why full recourse is the norm for land.

Worked example: an illustration, not a quote

Assume six entitled acres that can be split into four pads, listed at $3,000,000. A bank agrees to 55% of cost at 9.00% interest only, and the plan runs 24 months. Every number below is invented to show the method.

Line Amount
Purchase price $3,000,000
Supervisory raw-land ceiling on that value (65%, a cap only) $1,950,000
Illustrated loan at 55% $1,650,000
Cash needed at closing, before fees $1,350,000
Interest per year ($1,650,000 at 9.00%) $148,500
Tax and insurance per year $42,000
Engineering and approvals per year $90,000
Carry per year $280,500
Carry for 24 months $561,000

Equity required to finish the plan is $1,911,000 before closing costs, about 64% of the price. The loan covers less than the headline leverage suggests, since all the carry comes from the borrower.

Now test the price. Four pads at $1,100,000 average bring $4,400,000.

Line Amount
Pad sale proceeds $4,400,000
Purchase price ($3,000,000)
Carry over 24 months ($561,000)
Site work to deliver pads ($700,000)
Selling costs at 5% ($220,000)
Result ($81,000)

A 47% spread between land cost and pad sales turned into a loss. Reverse the math to find what the site can bear with a 15% profit on proceeds ($660,000), with non-interest carry of $264,000 and financing at 55% of price at 9.00% for two years. Proceeds of $4,400,000, less $660,000 of profit, $220,000 of selling costs, $700,000 of site work and $264,000 of carry, leave $2,556,000 for land and interest. Interest is 9.90% of the price over two years, so the price is $2,556,000 divided by 1.099, or about $2,326,000. That is roughly $674,000 under the ask.

The land loan barely enters this calculation. It is a price problem first.

From land loan to construction loan

Most land loans exist only until construction closing. Plan for the capital test early.

A commercial construction loan is treated as high volatility, at a 150%4 risk weight, unless the borrower has contributed 15% of appraised as-completed value5 and the loan meets the supervisory limit. Federal law counts contributed real property at its appraised value, and the money must be in before the bank advances. So land bought years ago at a low price can carry much of that equity requirement at today’s appraisal. That is the single best argument for owning the site free and clear going into construction. An owner who has a land loan in place should ask how the payoff will be treated in the calculation.

Timing matters as much. A land loan maturing before the permit issues forces an extension fee, a new appraisal or a refinance at the worst moment. Set the term to the slowest realistic approval path, then negotiate extensions tied to milestones: site plan filed, approval received, building permit issued.

Which programs fit, and which refuse

Source Fit Reason
Bank land loan Best price when the guarantor qualifies Within supervisory limits; expects a takeout
Hard money Fast, partial entitlement, short hold Priced for risk; no federal LTV rule
Debt fund Larger entitled sites with an institutional sponsor Sized to the business plan
SBA and owner-occupied programs A business buying a site for its own building Occupancy must reach 60% of rentable space at completion6. Passive holdings and speculative businesses are out under 13 CFR 120.110
CMBS, Fannie Mae, Freddie Mac, FHA permanent loans No These programs need income-producing property or a housing project being built, not vacant commercial land
DSCR loans No There is no rent to divide by a payment

A note on farmland: agricultural land is carved out of the high volatility definition, and Farm Credit or USDA channels may serve a parcel still in production. A site being held for conversion is a separate discussion with those lenders, and those programs are outside what this site tracks.

Environmental and site questions a lender will ask

Vacant does not mean clean. A Phase I still applies, and to preserve the federal landowner protections it must be done on the schedule the rule sets: A Phase I must be done within 1 year before acquisition, with interviews, lien and records searches and site visit updated within 180 days7. Look harder at sites with past farming (pesticide residue), old gas stations or dry cleaners nearby, fill of unknown origin, and former industrial use.

Wetlands. The federal reach depends on the definition of waters of the United States, which is in motion. EPA’s page, last updated October 14, 2026, shows a proposal from November 2025 and a supplemental proposal from September 2026, neither final, following the Supreme Court’s 2023 Sackett decision. State and local wetland rules apply separately. Do not model a site on a rule that has not been adopted.

Other items that move the buildable area or the schedule:

  • Flood zone and floodway mapping, which can remove land from use entirely.
  • Protected species or habitat surveys, with survey windows that follow the season.
  • Utility capacity letters. A moratorium on sewer connections stops a site that is otherwise ready.
  • Impact fees, traffic studies and required off-site road work, which belong in the cost column.
  • Access: a recorded legal access easement and a curb cut the highway authority will actually permit.
  • Severed mineral rights and old easements that cross the only buildable pad.

Red flags that stop a land file

  • The contract price is above recent land sales, and the only support is a developer’s pro forma.
  • The exit depends on a rezoning that a neighbor group has already opposed.
  • A seller note sits behind the bank without a standstill agreement.
  • The guarantor’s liquidity is the same money shown as the down payment.
  • Interest reserve is sized for the first year of a three-year approval path.
  • The survey shows acreage, but no one has calculated net buildable area.
  • A pending pad buyer has a free walk right that lasts through closing.

What to bring

  • Purchase contract with all amendments, and the seller’s title commitment
  • ALTA survey showing easements, encroachments and flood lines
  • Zoning letter, and any approvals, conditions and expiry dates
  • Concept plan with a net buildable calculation
  • Phase I, wetland delineation and geotechnical report, as applicable
  • Utility and access confirmations
  • Budget and schedule through entitlement, with carry shown by month
  • Takeout evidence: construction lender discussions, letters of intent, ground lease or pad contracts
  • Guarantor statement of liquidity, three years of tax returns and a schedule of contingent liabilities

Bring the site with its stage, its proposed use and your exit, and we will tell you which part of the market is worth calling. Get financing for a land purchase or a land refinance.

Similar property types

All property types

Questions people ask

Can I use the land I already own as my equity in a construction loan?

Usually, yes. Under the federal definition of a high volatility construction loan, real property a borrower contributes counts at its appraised value, and the test is 15% of appraised as-completed value5. Expect the bank to net out any debt on the land, and expect the contribution to be in place before it funds.

Why is the interest on land often paid from my own cash?

Nothing on the site produces income to pay it. A lender may allow an interest reserve inside the loan, and federal guidelines tell banks to set policy limits on interest reserves, but a reserve is still borrowed money and reduces the proceeds you can use for the land itself.

Can an SBA loan buy a vacant lot?

It can be part of a project where your operating business will build and occupy the building, which must reach 60% of rentable space at completion6. SBA rules treat passive holdings by developers and landlords as ineligible, and speculative businesses too, so buying land to hold or resell falls outside the program.

Do wetlands kill a land loan?

Not automatically, but an unresolved question stops most lenders until a consultant has delineated the site. A lender cares less about the rule than about whether the buildable area in the appraisal is the area you can legally build on.

Sources

  1. Interagency Guidelines for Real Estate Lending Policies, 12 CFR Part 365, Appendix A to Subpart A (eCFR), as of October 29, 2026
  2. Interagency Guidance, Concentrations in Commercial Real Estate Lending, Sound Risk Management Practices, 71 FR 74580 (Federal Register, Dec. 12, 2006), as of December 12, 2006
  3. Federal Reserve Board, July 2026 Senior Loan Officer Opinion Survey on Bank Lending Practices (released August 3, 2026), as of August 3, 2026
  4. 12 CFR 324.32(j) (eCFR), as of October 29, 2026
  5. 12 CFR 324.2, definition of HVCRE exposure (eCFR), as of October 29, 2026
  6. SBA SOP 50 10 8.1, Lender and Development Company Loan Programs (effective Oct 1, 2026), as of October 1, 2026
  7. 40 CFR 312.20, All Appropriate Inquiries timing, eCFR, as of October 29, 2026
  8. 12 CFR Part 34, Subpart D, Appendix A: Interagency Guidelines for Real Estate Lending, as of November 2026
  9. 12 U.S.C. 1831bb: capital rules for HVCRE ADC loans, as of November 2026
  10. 13 CFR 120.110: businesses ineligible for SBA business loans, as of November 2026
  11. EPA: Waters of the United States rulemaking status, as of October 14, 2026

How we check figures: methodology and editorial policy.

Get financing for this deal

Send the property and the loan once. A person at Janover Capital LLC reads it, tells you which programs fit and replies, usually within one business day.

Get financing